Latest works
 
 
 
 
          A.M.Y.Sub.net
 
 
  2012 - Works of recovery of the door of the dry dock wall - Military Arsenal Messina 
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  | Homepage | Works | Latest Works | Equipments | Gallery | Contacts | Who am I? |
 
 
  
 
 
  
 
 
  2012 - Dry dock italian navy tank ship
 
 
  
 
 
  
 
 
  
 
 
  
 
 
  2012 - Inspection of the galleries of the suction pumps of dock wall
 
 
  
 
 
  
 
 
  
 
 
  2012 - Wall dry dock mat substitution
 
 
  2012 - Italian tugboat in floating dock